What the project covered

The scope names the systems, the records that must move and what happens when a record fails. The project connects those paths and checks them against a real example before handover. A system that was not named is a change, not an assumption.

The client kept one relationship. Hire Freelancer kept the coordination, the files and the check before handover. That sequence is the same one on how it works.